亚洲天堂免费在线,丰满人妻在公车被猛烈进入电影,国产又黄又潮娇喘视频在线观看 ,久久黄色大片,国产女人伦码一区二区三区不卡,校花娇荡吟喘上课,亚洲区中文字幕在线不卡电影,亚洲黄色网页

合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

QBUS 6820代寫、代做Python編程設計
QBUS 6820代寫、代做Python編程設計

時間:2025-05-22  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



Prescriptive Analytics: From Data to Decision – QBUS 6820

Semester 1, 2025

Assignment 2

Issued: 2 May 2025

Submit date: Monday 19 May 2025 at 11:59pm

All problems to be submitted for assessment (20%)

Assignments must be typed. Handwritten assignments will not be accepted.

Submission of assignments is strictly through Canvas

For all the questions you are required to provide your Python Code (this can be done in

an appendix).

Question 1 (7 marks):

The owner of a commercial building has decided to renovate her facility. She has identified

the following activities that must be performed before she can reopen for business:

Activity Description Duration (in days) Predecessor activities

A New Plumbing 13

--

B Order/Rec Furniture 23

--

C Order/Rec Flooring 18

--

D Construct Partitions 8

--

E Paint & Wallpaper 8

A, D

F Install Furniture 6

E, B

G Install Flooring 7

E, C

H Move Inventory & Rec's 4

F, G

I Clean Old Shop 4

H

a. Draw the activity network for this problem (AON).

b. Provide the earliest and latest start and finish times, the slack for each activity, and identify

the critical activities (either on the network or in a table).

c. What is the duration of the project? Provide the critical paths(s).

d. Suppose that the owner has a binding contract stating that she must complete the

renovation within 32 days. The normal and crash times and costs for each activity are

summarized in the table below. Is it possible for her to complete the project within 20

days? If it is possible, at what cost? If it is not possible, what is the earliest time she can

complete the project and at what cost?

Activity

Normal Crash

Time (days) Cost (dollars) Time (days) Cost (dollars)

A 13

11,000 10 15,000

B 23

5,000 21 6,000

C 18

3,000 15 3,500

D 8

1,500 6 2,000

E 8

750 5 1,200

F 6

600 4 1,200

G 7

1,000 5 1,500

H 4

250 3 450

I 4 200 2 300

Question 2 (6 marks)

You are in charge of loading Cargo ships in Newcastle port. An agricultural commodities

dealer wants to transport the following products aboard a ship:

Commodity Amount available

(tons)

Volume per ton

(cubic feet)

Profits per ton ($)

1 48 4 7

2 30 2.5 5

3 15 3 6

4 18 4.5 8

You can select to load any and/or all of the available commodities. However, the ship has

three cargo holds with the following capacity restrictions:

Cargo hold Weigh capacity (tons) Volume capacity

(cubic feet)

Forward 32 180

Center 58 210

Rear 40 160

Only one type of commodity can be placed in any cargo hold (note that you can load the

same commodity in different cargos). However, because of balance considerations, the

weight in the forward cargo hold must be within 10% of the weight in the rear cargo hold

(this means that if the weight in the rear cargo is 10 tons, then that of the front cargo has

to be between 9 and 11 tons). In addition, the center cargo hold must be between 40% and

60% of the total weight on board.

Formulate an ILP model for the problem and solve it using Python.

Question 1 (7 marks):

A company needs to supply customers in 3 cities from its 3 warehouses.

The supplies,

demands and shipping costs (in dollars per unit) are shown below.

Destination

Warehouse 1 2 3 Supply

1 34 60 36 400

2 70 40 50 300

3 56 40 32 200

Demand 500 300 200

The company has identified the following goals:

Goal 1: The company would like to come as close as possible to satisfying its

customers demand. It would also like to come as close as possible to using the

warehouses supply.

Goal 2: It would like to ensure that the cost is approximately $60,000.

a. Formulate a goal programming model of this problem. Assume that your goal is to

minimize the sum of percentage deviations from your goals. You should assume that

warehouses hold 50 units of safety stock each (this means that they can use reserves

to increase their supply by 50 units. For example, Warehouse 1 would ideally supply

400 units, but can supply anywhere between 0 and 450 units).

b. Solve the problem using Python. Provide the Python code and clearly state your

solution.

c. How would your answer change if Goal 2 changes to $30,000? No need to

supply an addition Python code.

請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp

掃一掃在手機打開當前頁
  • 上一篇:QBUS6600代寫、Python/C++編程代做
  • 下一篇:COMP30023代做、代寫C/C++編程語言
  • 無相關信息
    合肥生活資訊

    合肥圖文信息
    仿真分析咨詢外包服務-結構 / 熱 / CFD流體 / 電磁 / 光學CAE代做
    仿真分析咨詢外包服務-結構 / 熱 / CFD流體
    流體仿真外包多少錢_專業CFD分析代做_友商科技CAE仿真
    流體仿真外包多少錢_專業CFD分析代做_友商科
    CAE仿真分析代做公司 CFD流體仿真服務 管路流場仿真外包
    CAE仿真分析代做公司 CFD流體仿真服務 管路
    流體CFD仿真分析_代做咨詢服務_Fluent 仿真技術服務
    流體CFD仿真分析_代做咨詢服務_Fluent 仿真
    結構仿真分析服務_CAE代做咨詢外包_剛強度疲勞振動
    結構仿真分析服務_CAE代做咨詢外包_剛強度疲
    流體cfd仿真分析服務 7類仿真分析代做服務40個行業
    流體cfd仿真分析服務 7類仿真分析代做服務4
    超全面的拼多多電商運營技巧,多多開團助手,多多出評軟件徽y1698861
    超全面的拼多多電商運營技巧,多多開團助手
    CAE有限元仿真分析團隊,2026仿真代做咨詢服務平臺
    CAE有限元仿真分析團隊,2026仿真代做咨詢服
  • 豆包網頁版入口 Trae 目錄網 排行網

    關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

    Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
    ICP備06013414號-3 公安備 42010502001045